Section 4 - Installation; Installation Checklist; Handling; Inspection - York YCAL Series Installation Operation & Maintenance

Air-cooled scroll chillers style d with ipu ii and i/o boards (50 hz) 29 ton to 65 ton
Hide thumbs Also See for YCAL Series:
Table of Contents

Advertisement

FORM 150.66-NM3
ISSUE DATE: 09/25/2020
To ensure warranty coverage, this
equipment must be commissioned and
serviced by an authorized Johnson
Controls service mechanic or a quali-
fied service person experienced in
chiller installation. Installation must
comply with all applicable codes, par-
ticularly in regard to electrical wiring
and other safety elements such as re-
lief valves, HP cutout settings, design
working pressures, and ventilation re-
quirements consistent with the amount
and type of refrigerant charge.
Lethal voltages exist within the control
panels. Before servicing, open and tag
all disconnect switches.

INSTALLATION CHECKLIST

The following items, 1 through 5, must be checked be-
fore placing the units in operation.
1. Inspect the unit for shipping damage.
2. Rig unit using spreader bars.
3. Open the unit only to install water piping system.
Do not remove protective covers from water con-
nections until piping is ready for attachment. Check
water piping to ensure cleanliness.
4. Pipe unit using good piping practice (see ASHRAE
handbook section 215 and 195).
5. Check to see that the unit is installed and operated
within limitations (Refer to LIMITATIONS).
The following pages outline detailed procedures to be
followed to install and start-up the chiller.

HANDLING

These units are shipped as completely assembled units
containing full operating charge, and care should be
taken to avoid damage due to rough handling.
JOHNSON CONTROLS

SECTION 4 - INSTALLATION

INSPECTION

Immediately upon receiving the unit, it should be in-
spected for possible damage which may have occurred
during transit. If damage is evident, it should be noted
in the carrier's freight bill. A written request for inspec-
tion by the carrier's agent should be made at once. Re-
fer to Instruction manual, Form 50.15-NM for more
information and details.

LOCATION AND CLEARANCES

These units are designed for outdoor installations on
ground level, rooftop, or beside a building. Location
should be selected for minimum sun exposure and to
ensure adequate supply of fresh air for the condenser.
The units must be installed with sufficient clearances
for air entrance to the condenser coil, for air discharge
away from the condenser, and for servicing access.
In installations where winter operation is intended and
snow accumulations are expected, additional height
must be provided to ensure normal condenser air flow.
Clearances are listed under Notes in the Dimensions -
YCAL0041 (English) section.
The unit should be lifted by inserting
hooks through the holes provided in unit
base rails. Spreader bars should be used
to avoid crushing the unit frame rails with
the lifting chains (See below).
4
LD10951
33