Mira Event Installation, Operation, Maintenance Manual page 37

Thermostatic all-in-one power shower
Table of Contents

Advertisement

6. Mixer Assembly Renewal
6. Mixer Assembly Renewal
6. Mixer Assembly Renewal
6. Mixer Assembly Renewal
6. Mixer Assembly Renewal
The following procedure can be applied for cleaning or replacing the mixer assembly.
Warning! Isolate the electrical and water supply to the appliance before proceeding.
Warning!
Warning!
Warning!
Warning!
Remove screws 1 to 10
Remove screws 11 to 13
6.1.
6.1.
6.1.
6.1.
6.1.
Follow the instructions 4.1
contained in the section "Inlet
Manifold Renewal"
Manifold Renewal"
Manifold Renewal"
Manifold Renewal"
Manifold Renewal".
6.2.
6.2.
6.2.
Remove the inlet manifold and
6.2.
6.2.
mixer assembly retaining screws,
pump saddle clamp retaining
screws and clamp.
6.3.
6.3.
6.3.
Remove the gear pot securing
6.3.
6.3.
screw and gear pot from mixer
assembly.
6.4.
6.4.
6.4.
6.4.
6.4.
Remove micro-switch retaining
screws, drip shield and micro-
switch.
Do not remove PCB wiring from
micro-switch.
Section 10
4.1
4.1
4.1 to 4.4
4.1
4.4
4.4
4.4
4.4
"Inlet
"Inlet
"Inlet
"Inlet
37
37
37
37
37

Advertisement

Table of Contents
loading

Table of Contents