Mira Event Installation, Operation, Maintenance Manual page 35

Thermostatic all-in-one power shower
Table of Contents

Advertisement

Inlet
manifold
assembly
Flow knob
Cover
retaining
screw
Mixer
Hose washer
Flexible hose
Temperature
trim
Temperature
knob
Section 10
4.8.
4.8.
4.8.
4.8.
4.8.
Whilst gripping the mixer
assembly disconnect the inlet
manifold.
4.9.
4.9.
4.9.
The ports adjacent to the mixer
4.9.
4.9.
assembly contain the inlet check
valves. The check valves can be
removed and replaced if
required. Ensure the check valve
is inserted so the 'O' seal on
check valve faces into the outlet
of the manifold.
4.10. Inspect inlet manifold 'O' seals
4.10.
4.10.
4.10.
4.10.
and renew if required.
Tip!
Tip!
Tip!
Tip!
Tip! When refitting the inlet
manifold, lightly grease 'O' seals
with a silicone based lubricant.
4.11.
4.11.
4.11. Refit in reverse order.
4.11.
4.11.
4.12.
4.12. Restore the water supplies and
4.12.
4.12.
4.12.
check for any leaks.
4.13. Refit the cover by locating the
4.13.
4.13.
4.13.
4.13.
cover onto the tongue on the top
of the case. Push the bottom of
the cover against the case,
tighten the cover retaining screw,
refit the flow knob, temperature
trim and temperature knob.
4.14. Prime the pump, refer to
4.14.
4.14.
4.14.
4.14.
"Commissioning: Priming the
"Commissioning: Priming the
"Commissioning: Priming the
"Commissioning: Priming the
"Commissioning: Priming the
Appliance"
Appliance"
Appliance"
Appliance"
Appliance".
4.15.
4.15.
4.15. Restore the electrical supplies.
4.15.
4.15.
35
35
35
35
35

Advertisement

Table of Contents
loading

Table of Contents