Mira Event Installation, Operation, Maintenance Manual page 15

Thermostatic all-in-one power shower
Table of Contents

Advertisement

6. 6. 6. 6. 6.
Change the Inlet Supply P
Change the Inlet Supply Por or or or orts ts ts ts ts
Change the Inlet Supply P
Change the Inlet Supply P
Change the Inlet Supply P
Section
Temperature
knob
Override
button
Flow
knob
Cover retaining
screw
Temperature
trim
Blanking
plugs
Release
tool
Inlet
manifold
Section 5
6.1.
6.1.
6.1.
This procedure changes the
6.1.
6.1.
blanking plug positions to allow
for a top or back inlet supply
configuration.
6.2.
6.2.
6.2.
Use the push-fit release tool
6.2.
6.2.
(supplied) to lever off the
temperature knob, temperature
trim and flow knob.
Note!
Note! Use of a screwdriver will
Note!
Note!
Note!
damage
damage
damage
damage the knobs and the cover
damage
assembly
6.3.
6.3.
6.3.
6.3.
6.3.
Unscrew the cover retaining
screw and remove the cover by
pulling the bottom of the cover in
an outward and upward direction
6.4.
6.4.
6.4.
Remove the inlet blanking plate
6.4.
6.4.
as appropriate.
6.5.
6.5.
6.5.
6.5.
6.5.
Insert the push-fit release tool
between the flange of each of the
blanking plugs and the grey collet
of the inlet manifold, and lever
the plugs outward.
Whilst holding back on the collet,
pull out each appropriate
blanking plug by hand.
Install the two blanking plugs in
the manifold bottom inlets.
will
will
will
will
15
15
15
15
15

Advertisement

Table of Contents
loading

Table of Contents