Mira Event Installation, Operation, Maintenance Manual page 13

Thermostatic all-in-one power shower
Table of Contents

Advertisement

4. 4. 4. 4. 4.
Schematic Installation Diag
Schematic Installation Diag
Schematic Installation Diagr r r r r ams
Schematic Installation Diag
Schematic Installation Diag
25mm
minimum
Cistern
Minimum
1.0m head
Minimum
Ø22mm
D.H.W.
D.H.W.
D.H.W.
D.H.W.
D.H.W.
60
Isolating valve
Other cold
*
draw offs
*
Other hot draw offs
A A A A A
Warning pipe
Vent
pipe
B B B B B
o
C
Hot supply
Other hot draw offs
Schematic Installation - Correct
Schematic Installation - Correct
Schematic Installation - Correct
Schematic Installation - Correct
Schematic Installation - Correct
Avoid high-level hot
feed pipe runs (may
Cistern
Vent
pipe
D.H.W.
D.H.W.
D.H.W.
D.H.W.
D.H.W.
Side
This layout is not
60
o
C
entry
boss
* Incorrect supply
Schematic Installation - Incorrect
Schematic Installation - Incorrect
Schematic Installation - Incorrect
Schematic Installation - Incorrect
Schematic Installation - Incorrect
ams
ams
ams
ams
Minimum
75mm head
Hose
retaining
ring
cause air locking)
supply
*
Cold
supply
*
not
not
not suitable
not
for the Mira Event
connections
Section 5
A A A A A
Cylinder Feed
Cold Pump Feed
B B B B B
Vent
90
30
o
o
60
Isolating valves
missing
Hot
(see Water Byelaws)
Strained hose
Warning
pipe
o
Hose retaining
ring missing
13
13
13
13
13

Advertisement

Table of Contents
loading

Table of Contents