Mira Event Installation, Operation, Maintenance Manual page 19

Thermostatic all-in-one power shower
Table of Contents

Advertisement

Chamfer
1.9.
1.9.
1.9.
1.9.
1.9.
supply pipework is cut squarely
and free from burrs
damage the inlet manifold seals.
Chamfer the end of the pipe to
assist insertion into the fitting and
prevent tearing the 'O' seal.
Thoroughly flush the incoming
Thoroughly flush the incoming
Thoroughly flush the incoming
Thoroughly flush the incoming
Thoroughly flush the incoming
hot and cold water supply
hot and cold water supply
hot and cold water supply
hot and cold water supply
hot and cold water supply
pipes
pipes
pipes
pipes (Bye-law 55).
pipes
Note!
Note!
Note! If using chrome plated
Note!
Note!
copper pipework then all traces
of chrome plate will need to be
removed from the connecting
surfaces. If the chrome is not
completely removed then the
inlet manifold collet will not grip
the supply pipe and under
pressure the pipes may be
forced out.
Do not
Do not
Do not use stainless steel piping.
Do not
Do not
Note!
Note!
Note!
Note! PTFE tape or liquid
Note!
jointing is not
connection.
Section 6
Ensure that the end of the
free from burrs
free from burrs
free from burrs, which will
free from burrs
not
not
not required to assist
not
19
19
19
19
19

Advertisement

Table of Contents
loading

Table of Contents