Download Print this page

Confer Plastics ROLLGUARD 7200 Assembly And Installation Manual page 3

A-frame ladder

Advertisement

STEP 1:
INSIDE LADDER
#1: Lay "IL" rail on flat surface.
#3-5: Install 3 more treads, for a total of 4, see above pictures.
#6: Lay "IR" rail on flat surface.
Tools needed:
Parts needed:
Incorrect, do not
block track.
#7: Lift/rotate and align tread tabs
to fit into rail openings..
#9: Do Not Install bottom
tread until Step 4!
rubber mallet
1- Inside left rail (marked "IL" at the top)
1- Inside right rail (marked "IR" at the top)
4- Ladder treads
#2: Correct, tap down
until seated, note track is
not blocked..
#8: Tap all 4 treads down
until seated..

Advertisement

loading
Need help?

Need help?

Do you have a question about the ROLLGUARD 7200 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel