Nice WIDE M Installer's Instructions page 6

High traffic, battery back-up traffic barrier
Table of Contents

Advertisement

Jack-knife boom pole.
High dust and sand environment.
High salinity environment.
Aluminium fence installed.
Mobile pole support installed.
Ambient temperature above 40
Operation regularly interrupted by safety beam circuit trigger.
Operation regularly interrupted by the Emergency Stop circuit trigger.
Speed set to above 50%.
Safety overload force level set to above 50%.
Using the above table, total up the applicable work impact consider-
ations to calculate the site's severity index. Apply the totalled up se-
verity index % to the graph on the right to estimate the total expected
number of operations before first major service.
Major service interval guide.
Work impact considerations
C or below 0
C.
o
o
500.000
400.000
300.000
200.000
100.000
0
6
Severity index
Wide M
Wide L
15%
10%
10%
5%
15%
5%
15%
15%
15%
10%
10 20 30 40 50
60 70 80 90 100
Severity index (%)
Indice di gravosità (%)
N/A
10%
10%
5%
15%
5%
15%
15%
15%
10%

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wide l

Table of Contents