3D Systems Viper Pro SLA iPro 8000 Quick Start Manual page 29

Table of Contents

Advertisement

q u i c k s t a r t g u i d e
2 Release the inner door latch and open the container holder door.
3 Place a resin container into the container slot and remove the container lid and the induction
seal.
4 Close the container holder cover until the inner cover latch has been properly locked.
Caution!
If the O-ring is not seated correctly inside the neck of the resin container, or the
door is not properly latched, a resin spill is likely.
5 Lift the resin refill door until the vent cap faces up and the refill door is nearly closed.
6 Remove the vent cap and place it on the cap retainer for storage.
7 Using the puncture tool, place a small vent hole in the center of the vent spout.
8 When the vent hole has been made, return the puncture tool to the holding clips.
9 Close the resin container door firmly until it latches securely.
Leveling Bottle
A leveling bottle, contained in the right receptacle, is connected to the leveling pump. It moves
resin from the leveling container, as required by the machine.
29
r d m i n s t a l l a t i o n a n d r e m o v a l

Advertisement

Table of Contents
loading

This manual is also suitable for:

Viper pro sla ipro 9000

Table of Contents