3D Systems Viper Pro SLA iPro 8000 Quick Start Manual page 37

Table of Contents

Advertisement

q u i c k s t a r t g u i d e
2 Sit the platform on two L-shaped guides in the rear of the RDM.
3 Push the platform against the front platform guides.
4 The notches in the platform need to engage into the front platform guides
5 Go to the Control Panel, select a part, and start a build.
6 When correctly installed and started, the elevator main stage moves to the Build Start position.
Platform Release
After the build is complete, select "drain platform." This function raises the elevator motion stage
to the top and the locking mechanism disengages. The user can then reach in, move the platform
backward, release the locking tab, and then slide the platform back and remove it.
Is the RDM Full?
Recoating with the Vacuum On
Levelling the resin for a build
Pumping Material to and from the Level Reservoir
Controlling the Chamber Temperature
Building the Support Layers
Building the Part Layers
37
r d m r e m o v a l

Advertisement

Table of Contents
loading

This manual is also suitable for:

Viper pro sla ipro 9000

Table of Contents