Wiring - SMC Networks ZK2-ZSV-A Series Operation Manual

Digital pressure switch for energy-saving control ejector
Table of Contents

Advertisement

Wiring

■Wiring
○Connection
Connections should only be made with the power supply turned off.
Use separate routes for the Pressure switch wiring and any power or high voltage wiring. Otherwise,
malfunction may result due to noise.
Ensure that the FG terminal is connected to ground when using a commercially available switch-mode
power supply. When a switch-mode power supply is connected to the product, switching noise will be
superimposed and the product specification can no longer be met. This can be prevented by inserting a
noise filter, such as a line noise filter and ferrite core, between the switch-mode power supply and the
product, or by using a series power supply instead of a switch-mode power supply.
○Connector use for pressure switch
Connecting/Disconnecting
When mounting the connector, insert it straight into the socket holding the lever and connector body, and
push the connector until the lever hooks into the housing, and locks.
When removing the connector, press down the lever to release the hook from housing and pull the
connector straight out.
Pin No. of the Connector (Power supply and output cable for the digital pressure switch and pilot
valve)
-15-
NO.ZK2-OM00501-B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents