Maintenance - SMC Networks ZK2-ZSV-A Series Operation Manual

Digital pressure switch for energy-saving control ejector
Table of Contents

Advertisement

Maintenance

How to reset the product for power cut or forcible de-energizing
The setting of the product will be retained as it was before a power cut or de-energizing.
The output condition is also basically recovered to that before a power cut or de-energizing, but may change
depending on the operating environment. Therefore, check the safety of the whole facility before operating the
product.
If the facility is under accurate control, wait until it has warmed up. (Approximately 10 to 15 minutes)
-46-
NO.ZK2-OM00501-B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents