3.1 Installation Preparations

Floor Loading Capacity
The floor can bear the weight of the UPS and its optional components. In the case
of rack-mounted installation, ensure that the floor can also bear the weight of the
rack.
Installation Environment
Installation Clearances
Reserve a clearance of at least 500 mm from the front and rear of the chassis.
Issue 01 (2020-08-06)
Do not install the UPS in a high-temperature, low-temperature, or damp place
that is beyond the technical specifications.
Keep the UPS far away from water, heat sources, and flammable and
explosive substances. Install the UPS in an environment free of dust, volatile
gas, salt, and corrosive materials. Avoid direct sunlight.
Do not install the UPS in environments with conductive metal scraps in the
air.
The optimal operating temperatures for batteries are 20–30°C. Operating
temperatures higher than 30°C shorten the battery lifespan, and operating
temperatures lower than 20°C reduce the battery backup time.