Kohler Command Pro CV173 Service Manual page 62

Hide thumbs Also See for Command Pro CV173:
Table of Contents

Advertisement

Reassembly
Prepare Engine for Operation
Engine is now reassembled. Before starting or operating
engine be sure to do following:
1. Make sure all hardware is properly torqued.
2. Make sure oil drain plugs are tightened securely.
3. Ensure crankcase is fi lled with correct oil.
Connect Spark Plug Lead
Connect lead to spark plug.
Testing Engine
NOTE: Engine can be installed in application and
speeds can be checked/set.
1. Run engine for 5-10 minutes between idle and
mid-range. Adjust throttle and choke controls and
high speed screw on speed control bracket as
necessary. Make sure maximum engine speed does
not exceed recommended RPM.
For CV173 engines high speed is 3300 RPM.
For CV200, CV224 engines high speed is 3500
RPM.
2. Adjust carburetor low idle speed screw so low idle
speed is set to 1800 RPM or application
specifi cations. Refer to Fuel System.
62
KohlerEngines.com
14 690 12 Rev. --

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Command pro cv200Command pro cv224

Table of Contents