Kohler Command Pro CV173 Service Manual page 53

Hide thumbs Also See for Command Pro CV173:
Table of Contents

Advertisement

Install Oil Pan Assembly
Torque Sequence
3
5
2
CV173 Sealant Pattern
A
CV200, CV224 Sealant Pattern
A
A
1.5 mm (1/16 in.) bead of sealant.
B
NOTE: When installing oil pan, ensure plunger on
governor gear is pressed fully into governor.
Incorrectly installing governor plunger may result
in damage.
NOTE: Always use fresh sealant. Using outdated
sealant can result in leakage. Use Permatex
Ultra Grey
®
sealant.
1. Sealing surfaces of crankcase and oil pan should be
clean, dry, and free of any nicks or burrs.
2. Install 2 dowel pins into oil pan.
3. Install thrust washer on crankshaft.
14 690 12 Rev. --
1
6
4
B
B
B
B
Dowel Pin
KohlerEngines.com
4. Apply a 1.5 mm (1/16 in) bead of Permatex
Grey
sealant to sealing surface of oil pan. See
®
sealant pattern for engine being serviced. Oil pan
must be installed within 10 minutes of RTV
application.
5. Guide oil pan onto crankcase, ensuring camshaft, oil
pump, and governor gear align with their mating
surfaces. Rotate crankshaft slightly to help engage
governor gear.
6. Install and fi nger tighten screws securing oil pan to
crankcase.
7. Use torque sequence shown and torque oil pan
screws to 14.7 N·m (130 in. lb.).
Install Dipstick Tube
A
Dipstick Tube
Insert dipstick tube into oil pan and secure to crankcase
with screw. Torque screw to 8 N·m (71 in. lb.).
®
Reassembly
®
Ultra
A
B
B
Screw
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Command pro cv200Command pro cv224

Table of Contents