4 - Sprayer setup
General info
Unloading the sprayer from the truck
For the unloading of the sprayer, you need a crane. When unloading
with a crane please observe the lifting points as shown on the pictu-
re, and make sure that the straps or belts used for lifting are strong
enough.
Before putting the sprayer into operation
Although the sprayer has been applied with a strong and protective surface treatment on steel parts, bolts etc. in the fac-
tory, it is recommended to apply a film of anticorrosion oil (e.g. CASTROL RUSTILLO or SHELL ENSIS FLUID) on all metal
parts in order to avoid chemicals and fertilisers discoloring the enamel. If this is done before the sprayer is put into opera-
tion for the first time, it will always be easy to clean the sprayer and keep the enamel clean for many years. This treatment
should be carried out every time the protection film is washed off
Support leg
The support leg is stored in the bracket on the sprayer's right side
when the sprayer is attached to the tractor. To remove the support
leg: Lift the leg, remove the linch pin and pull out the support leg.
The support leg can then be mounted to the drawbar extension
and secured by linch pin.
4.1