HBM C16i Series Mounting Instructions page 13

Hide thumbs Also See for C16i Series:
Table of Contents

Advertisement

Available languages

Available languages

Mounting
pin must be introduced into the bore on the upper load
introduction part.
Tip
Please also refer to and comply with the special notes at
the end of this chapter.
The areas or foundations below the lower load introduc­
tion part (for carrying off the load) and above the upper
load introduction part should be as even and level as
possible.
Practically drill the required borings for securing and fix­
ing on the weighbridge resp. tank and base plate before
you mount the weighing platform. The dimensions for use
with EPO3/50t and C16/EPU44A or C16/ZOU44A are as
shown in the dimensioned drawings in 8.
C16i
11
A1461-2.0 HBM: public

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C16i d1C16i c3

Table of Contents