HBM C16i Series Mounting Instructions page 16

Hide thumbs Also See for C16i Series:
Table of Contents

Advertisement

Available languages

Available languages

Mounting
14
S Now let down the weighbridge carefully such that
there is just no load on the load cells and that they
can be aligned perpendicularly. At the same time,
introduce the load cells' upper load introduction parts
into the upper load carrying element. For this purpose,
you can move the lower load introduction element
with the eccentric washers loosened. We recommend
that you use an appropriate prism level to check the
load cell's perpendicular mounting position by holding
it against the cylindrical housing tube. Then let down
the bridge and proceed in the same way for the other
face.
CAUTION
Align load cells vertically!
S After finishing themounting procedure, once again
check the perpendicular mounting position for all the
load cells, with the bridge swinging free and if
required, lift the bridge to correct the position. Exact
mounting is an important condition for accurate
measurements and minimum corner deviation.
S Once the final perpendicular alignment of all load cells
has been completed, turn the eccentric washers
towards the load introduction part and secure by
tightening the fixing screws.
S Turn the flexible tube already mounted on the load
cell down over the compression pad and directly fix it
on the compression pad using the tube clip.
A1461-2.0 HBM: public
C16i

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C16i d1C16i c3

Table of Contents