Index - Overland Storage NEO 8000 Installation Manual

Hide thumbs Also See for NEO 8000:
Table of Contents

Advertisement

A
alignment pins........................................... 3-2, 5-1
C
cable channel modification .............................. 3-1
Cartridge Cycle test.......................................... 6-3
circuit breakers................................................. 2-2
clearance required ............................................ 2-1
connecting hardware tightening ..................... 4-4
connector bolt locations ................................... 4-1
conventions......................................................... iv
customer support................................................ iv
D
D-clamp location............................................... 3-2
drawer enabling requirement.......................... 6-2
E
electrostatic discharge information................. 1-3
F
final Slave wiring routing ................................ 4-5
firmware
minimum level ........................................... 2-1
updates ....................................................... 2-3
H
Horizontal Robotics Assembly (HRA)............. 1-1
HRA kit ............................................................. 2-1
HRA major components ................................... 1-2
HRA PWA Connectors ..................................... 5-3
I
installation overview ........................................ 1-1
installing the HRA wiring......... 3-6, 3-7, 3-9, 3-11
L
large level placement........................................ 4-3
leveling a library............................................... 4-2
library configuration ........................................ 6-1
library door removal......................................... 2-5
104370-102 07/2005
M
Magazine Latch assembly location ................. 3-4
Mail Slot PWA........................................... 3-3, 3-4
Master Power Wiring Harness
connection.................................................. 3-9
installation................................................. 3-7
routing ....................................................... 3-9
Master Signal Cable
connection.................................................. 3-7
installation................................................. 3-6
routing ....................................................... 3-7
media drawers .................................................. 2-4
minimum firmware level ................................. 2-1
mixing drive types............................................ 2-1
Mounting Bracket
assembly..................................................... 3-1
minimum tolerances ................................. 4-4
sensor cable................................................ 3-3
N
nylon door washers .......................................... 2-6
O
Overland Storage Technical Support ............... iv
P
positioning the Slave next to the Master........ 4-3
POST ................................................................ 2-3
power down process ......................................... 2-4
power supply
connectors.................................................. 3-9
power switch.............................................. 2-2
power up process....................................... 2-2, 6-1
process overview .............................................. 1-1
R
rear access plate removal ................................ 2-6
required tools ................................................... 1-2
robotics overview ............................................. 1-1
Robotics Power Supply location...................... 3-8
S
serial number ................................................... 3-3
side panels ........................................................ 2-4

Index

1

Advertisement

Table of Contents
loading

This manual is also suitable for:

104370-102

Table of Contents