Overland Storage NEO 8000 Unpacking Instructions

Overland Storage NEO 8000 Unpacking Instructions

Library
Hide thumbs Also See for NEO 8000:

Advertisement

NEO 8000™ Library
Important Unpacking
Instructions
This document describes how to unpack and set up a new
NEO 8000 Library. This same information is also found in
the Overland NEO 8000 Library User Guide.
WARNING: Due to the weight and size of the library, it
is recommended that at least two people be involved
with the unpacking process.
CAUTION:
Read and become familiar with the entire
document before starting this unpacking procedure.
Steps performed out of sequence may cause damage to
the library which voids existing warranties.
1. Position the shipping container on a level surface with
adequate clearance to work around it
NOTE: The container pallet is labeled "RAMP SIDE" on each
corner of the removal side.
Allow at least 10 ft. (3.0m)
Floor
Part Number 104373-102 05/2008
Overview & Notes

Removing the Outer Carton

(Figure
1).
to remove the library
from the pallet.
Ramp (Front)
Figure 1. Unpacking Space Requirements
©2005 - 2008 Overland Storage, Inc.
NOTE: Retain all packaging materials in a protected place in
case the library needs to be shipped to a different location.

Tools Needed

These tools are required to unpack the library:
• 9/16" wrench
• 10" adjustable wrench
• Level tool
• Large flat-blade offset screwdriver
• Box knife
• #2 Phillips screwdriver
• Allow at least 10 ft. (3.0m) of clearance on the
removal side of the container
• Allow about 3 ft. (1.0m) of clearance around the other
three sides of the container
• Allow at least 8 ft. (2.5m) of vertical clearance
Allow 3 ft.
(1.0m) around
the library
Allow 8 ft.
(2.5m) vertical
clearance
Page 1 of 4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NEO 8000 and is the answer not in the manual?

Questions and answers

Summary of Contents for Overland Storage NEO 8000

  • Page 1 This document describes how to unpack and set up a new NOTE: Retain all packaging materials in a protected place in NEO 8000 Library. This same information is also found in case the library needs to be shipped to a different location.
  • Page 2 To provide access to the hold-down bolts and leveling the two leveling legs (Figure 6 on page 3). legs, remove the rear door of the library; set aside. Part Number 104373-102 05/2008 Page 2 of 4 ©2005 - 2008 Overland Storage, Inc.
  • Page 3 Figure 6. Raising the NEO 8000 Leveling Legs 5. Carefully move the library down the ramps and onto 3. Remove the front hardware holding the library on the the floor.
  • Page 4 6. Place the level across the top front edge of the library. Figure 8. Positioning the Level What’s Next? You are now ready to connect the library to your network. Refer to the Overland NEO 8000 Library User Guide for information required to complete this installation. Additional Help You can get additional technical support on the Internet at http://support.overlandstorage.com, or call...