Switching On The Vitocom 100 - Viessmann Vitocom 100 LAN1 Installation And Service Instructions Manual

Hide thumbs Also See for Vitocom 100 LAN1:
Table of Contents

Advertisement

Display and control elements
Flashes green
Flashes green
quickly

Switching on the Vitocom 100

!
Please note
If the connection values of the
power supply unit do not match
the power consumption of the
Vitocom 100, this can lead to
interruption of operations and
damage to the power supply or
the Vitocom 100.
Only use the power supply unit
supplied.
Initialisation
When the Vitocom 100 is initialising,
the following processes run in
sequence:
1. The Vitocom 100 starts and loads
the internal operating software
The operating status display "4" (see
page 19) flashes green after max.
40 s. After a few minutes, operating
status display "4" illuminates green.
(cont.)
The Vitocom 100 will initialise after the power supply unit is
plugged in or the reset button is pressed.
Software update is being installed. The device must not be
isolated from the mains.
1. Plug LV side of the plug-in power sup-
ply unit into terminal ! (see
page 14) of the Vitocom 100.
2. Plug power supply unit into standard
230 V~ socket.
Vitocom 100 is initialised (see "Initi-
alisation").
2. Connect with the Vitodata server
IP connection status display "3" (see
page 19) shows the procedure for
establishing the connection:
■ Flashes yellow slowly:
The Vitocom 100 is integrated into
the on-site IP network (obtain IP
address of DHCP server).
■ Flashes yellow quickly:
Internet connection is being estab-
lished.
■ Illuminates yellow:
Connection to the Vitodata server
is being established.
■ Illuminates green:
Secure connection to the Vitodata
server is established.
Commissioning
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents