Gerber Edge Owner's Manual page 24

Hide thumbs Also See for Edge:
Table of Contents

Advertisement

10. Click on OK.
11. Press F10 to send the job to the GERBER EDGE.
To load the material
1. When the GERBER EDGE receives the job, it may go through a
brief warmup cycle. If so, the GERBER EDGE display reads:
WARMING UP
2. After 1 to 2 minutes, the display shows the material loading prompt:
Vinyl: WHITE
3. Position the tensioner assembly behind the GERBER EDGE and
slide the roll of white vinyl material onto the roll holder. Pull the
end of the material away from the GERBER EDGE, then under
and over the tension arm roller toward the back of the GERBER
EDGE.
4. Raise the GERBER EDGE cover.
5. Open the bail arms by lifting them up from the platen.
6. Clean the bail arm squeegees and platen using a lint-free pad
moistened with isopropyl alcohol. Allow to air dry before loading
material.
7. Use the keypad slew keys to slew the GERBER EDGE drive
sprockets so that the three closely-spaced teeth are facing up.
8. Put the vinyl into the back of the GERBER EDGE and seat the
three-hole pattern in the vinyl over the three closely-spaced teeth in
each sprocket and close the bail arms.
9. Slew the vinyl back and forth so that the squeegees clean the area to
be printed. Leave a leader of at least 2 inches beyond the front
squeegee.
Getting Started with the GERBER EDGE
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents