1
Open the front door, and insert the M6 cage nuts into the front post of the
rack.
Insert the M5 cage nuts into the center square hole among the three square holes (height of
1U) at the location line marking the mounting location of the table. One nut on each of the
left and right sides makes up a total of two nuts.
Insert the M6 cage nuts into the upper and lower square holes among the three square holes
(height of 1U) at the location line marking the mounting location of the table. Two nuts on
each of the left and right sides make up a total of four nuts.
124