Initial Considerations; Mounting The Static Neutralizing Bar - ITW SIMCO ION IQ Power Installation And Operating Instructions Manual

Static neutralizing system bps power supply with sensor technology
Table of Contents

Advertisement

Initial Considerations

Installation starts with mounting of the static neutralizing bar. Static bars are
typically installed just ahead of where problems due to static are occurring. The
power supply is installed in a convenient location within reach of the static bar
high voltage cable (standard length 3m [10 ft]) and visible to the machine operator.
Control station (where used) may be installed at any convenient location and
connected to the system using the modular low voltage cable.

Mounting the Static Neutralizing Bar

CAUTION – Fire Hazard
Do not install or operate static neutralizing bar in close proximity to any
flammable liquids or solvents.
IQ Power BPS
Figure 9. Jumper Position at J3 for Remote Control Operation
10
5201249 Rev. D

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SIMCO ION IQ Power and is the answer not in the manual?

Questions and answers

Table of Contents