Initial Considerations

Installation starts with mounting of the static neutralizing bar. Static bars are typically
installed just ahead of where problems due to static are occurring. The power supply is
installed in a convenient location within reach of the static bar high voltage cable and
visible to the machine operator. Communication modules (where used) may be installed at
any convenient location and connected to the system using the modular low voltage cable.
12
I Q Power™ B PS
5 20 11 97 Re v. D

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Simco-Ion IQ Power and is the answer not in the manual?

Table of Contents