Page 4
List of abbreviations – power supply – remote control – access control system – operating device (turnstile) – normally connected – normally opened Turnstile firmware version FW v1.75 Praktika T-01 turnstile...
PS, RC and ACS cables are connected. In the lower part there are holes for cable routing and base cover concealing the fixation of turnstile to the floor (Fig. 1). Fig. 1 General view of turnstile Praktika T-01 turnstile...
Page 7
LED panel Display panel of the turnstile is made of artificial stone with an insertion made of acrylic glass. Turnstile operating modes are displayed on the panel in the form of mnemonic signs depicting authorization and non- authorization of passage (Fig. Fig.
CAUTION! The producer disclaims any liability for damage to human life and health, total or partial loss of workability of products and (or) auxiliary equipment for non-compliance of the safety requirements specified in this section, as well as terminate the product warranty. Praktika T-01 turnstile...
IT IS NOT ALLOWED TO: • Set the power supply inside the turnstile housing as this could lead to electric shock to persons; • Set the turnstile other than dry and heated places; • Impede or accelerate the turnstile arms during on/off “antipanic” mode;...
5mm. Put anchors in the holes. 4.2.4. Cable routing is carried out through a hole 1 (Fig. 4) in the lower plate of turnstile. Cable conduit shall be prepared. 4.2.5. Open the box and unpack: • turnstile; Praktika T-01 turnstile...
Page 11
• remote control panel with cable; • base cover • lock keys (2 pcs.). 4.2.6. Route cable of RC panel, cable of PS unit and, if provided, cables of FA and ACS into cable conduit. Fig. 4. Installation dimensions 4.2.7. Set the turnstile on the prepared site (Fig. 4). Open the lock and remove the hatch (1, Fig.
Page 12
Set the base cover (4, Fig. 5) and secure it with the screw M6 included in the delivery set (3, Fig. 5). Install the hatch (1, Fig. 5) at its original position and close the lock. 4.2.9. Remove protective film from the housing of the turnstile. Praktika T-01 turnstile...
5. Connecting turnstile Connection of RC, PS and ACS is performed with the use of motherboard. In order to do it, open turnstile hatch (1, Fig. 5) with a key. Fig. 6 shows the location of motherboard in the housing. Fig.
CAUTION! Do not use power cable with cross-section less than 1.5 mm for connection. When the length of the power cable is more than 10 m it is recommended to use a cable with 2.5 mm cross-section. Praktika T-01 turnstile...
Turnstile is powered by 12V DC voltage. Maximum consumption (5A) is observed during "antipanic" mode when arms are folding. PS unit shall be selected on the basis of these parameters. Also note that an increase in the length of the supplied cable increases the voltage drop. Install the PS unit in a place with easy access for operator.
If both inputs are closed, passage is allowed in that direction the input which was closed first. If passage was not performed the turnstile will move to "Stop" mode automatically within 5 seconds. Praktika T-01 turnstile...
Page 17
CAUTION (!) In case of closure of one of STOP (or) AP inputs - commands from the remote cannot be accepted, i.e. ACS has a higher priority. AP and STOP inputs operate only in a potential mode, i.e. as long as the input is closed on GND contact the turnstile operates in the corresponding mode.
Contacts assignment is shown in Table 6. The numbering of the remote control buttons is shown in Fig. 8. The maximum output current for this set of contacts is 150 mA, maximum voltage rating is 24 W. Praktika T-01 turnstile...
Page 19
Fig. 8 Numbering of RC panel buttons Table 6. I/O contact set assignment Contacts Contact assignment marking I/O1 "Left" button status (1,0) I/O2 "Right" button status (3,08) I/O3 "Stop" button status (2, Fig.8) I/O4 Button "Antipanic" status (4,0) I / O1 ... I / O3 outputs show the current state of RC panel buttons, i.e. transistor is opened by pressing the corresponding button.
Page 20
RC panel buttons (except for the free passage in the potential control mode. See section 5.3 of Manual). In this case ACS controls these operation modes. Praktika T-01 turnstile...
Page 21
Fig. 10 Connection pattern of RC panel to ACS controller Installation guidelines...
Page 22
120 ohm resistors are already installed at the ends of the bus (in RC panels). J4 jumper can be taken off. A special RC panel is required to operate several turnstiles simultaneously. Standard RC is not appropriate for this purpose. Praktika T-01 turnstile...
Page 23
Appendix 2. Location of mounting holes in relation to overall dimensions of the turnstile Fig. 11 Location of mounting holes in relation to overall dimensions of the turnstile Installation guidelines...
Need help?
Do you have a question about the Praktika T-01 and is the answer not in the manual?
Questions and answers