PROTECTING THE FUTURE Contents List of abbreviations used ................4 1. Main technical parameters ............... 5 2. Design of the article ................. 5 3. Safety requirements ................11 4. Installation of the turnstile ..............13 4.1. Necessary equipment ................ 13 4.2.
List of abbreviations used - power supply unit S&FA - security and fire alarm - control board - access control system - normally closed - normally opened Turnstile firmware version _ v1.1 Full-height turnstile Oxgard Praktika Т-10 (T-10H)
PROTECTING THE FUTURE . Main technical parameters Table 1. General Parameter Turnstile Console Overall dimensions (H x W x D), 2290х1500х1375 107х107х25 Weight (net), kg Temperature range, °С: - during operation +1...+40 -40...+50 - during transportation and storage +1...+40 -40...+50 Relative air humidity, %, at most Width of a created passage, mm Through-flow rate, persons per...
Page 6
- in the initial state of the turnstile the passage zone is occluded by one leaf; from this state the standard operating modes of the turnstile can be assigned. Full-height turnstile Oxgard Praktika Т-10 (T-10H)
Page 7
PROTECTING THE FUTURE Fig. 1. Initial position of the leaves Installation instructions...
Page 8
PROTECTING THE FUTURE Fig. 2. General view of the turnstile. Full-height turnstile Oxgard Praktika Т-10 (T-10H)
Page 9
PROTECTING THE FUTURE Fig. 3. General view and overall dimensions of the turnstile Display panel The display panel of the turnstile is located at the upper module of the turnstile below an acrylic glass insert. The operating modes of the turnstile are displayed on the panels (from two sides), as mnemonic symbols for enabling/disabling the passage (Fig.
Page 10
4 (Fig. 2) through the cable input rack in the fixed enclosure panel 1 (Fig. The control board cable shall be extended if necessary. The control board shall be connected to the turnstile via the cross- board of Fig. 16 as per Table 4. Full-height turnstile Oxgard Praktika Т-10 (T-10H)
PROTECTING THE FUTURE Fig. 5. External appearance of the control board 3. Safety requirements When operating the turnstile it is required to follow general safety rules for operating electrical installations. It is forbidden to: - operate the turnstile in conditions not complying with the requirements to operating conditions - operate the turnstile under power supply voltage different from that specified in Table 2.
Page 12
& health, full or partial loss of functions of the article and/or auxiliary equipment due to non-observance of safety requirements of this section and void the warranty for this article. Full-height turnstile Oxgard Praktika Т-10 (T-10H)
PROTECTING THE FUTURE IT IS STRICTLY FORBIDDEN: to use compounds and liquids for cleaning the article, which are chemically aggressive for materials of the body. 4. Installation of the turnstile CAUTION! The turnstile shall be reliably installed so as to avoid its oscillation and/or capsizing in operation.
All the construction works shall be coordinated and agreed by a qualified engineer who possesses all Full-height turnstile Oxgard Praktika Т-10 (T-10H)
Page 15
PROTECTING THE FUTURE necessary information. The equipment shall be attached to the foundation before the operation starts! The original manufacturer shall not take responsibility for emergencies or failures resulted from improper fixture of the equipment. 4.2.5. Install the C clamps of Fig. 20 by means of the bolts with anchors (not included in the scope of supply) in the locations for fixturing of the turnstile.
Page 16
4.2.8. Assemble the fixe enclosure panel of the turnstile of Fig. 7. Install it on the prepared site by pre-passing into its rack CB cables, power supply cables, ACS and S&FA cables to the upper module. Full-height turnstile Oxgard Praktika Т-10 (T-10H)
Page 17
PROTECTING THE FUTURE 1 Bend section 5 Washer М12 DIN 125 2 Opposite bend section 6 Washer М12 DIN 127 3 Bolt М-12х40 DIN 933 7 Nut М-12 4 Plug 30-33T38ЧK Fig. 7. Assembly of the fixed enclosure panel. 4.2.9. Fix the fixed enclosure panel of the turnstile with the clamps 1 (2 pcs) and central clap 10, anchor bolts 2 and 10 M12 (Fig.
Page 18
PROTECTING THE FUTURE Fig. 8. Fixture of the fixed enclosure panel Full-height turnstile Oxgard Praktika Т-10 (T-10H)
Page 19
PROTECTING THE FUTURE 4.2.10. Install and fix the fixed enclosure element of the turnstile with the anchors (Fig. 9) by screwing them into respective openings by means of the 19-mm key. Install plastic caps onto heads of the fixture bolts. Fig.
Page 20
Fig.10. • Turn the sections of the wicket door so as: • (h upper > h lower). Place the rotor sections onto the upper flange so as to close the passage (Fig.1). Full-height turnstile Oxgard Praktika Т-10 (T-10H)
Page 21
PROTECTING THE FUTURE Installation instructions...
Page 22
Fix the upper module by fixing bolts of Fig. 11 and 12. Attention The upper module has a significant weight and therefore at least two workers are needed to lift it. Full-height turnstile Oxgard Praktika Т-10 (T-10H)
Page 23
PROTECTING THE FUTURE 1. Bolt М12х30 DIN 933 4. Nut М12 DIN 934 2. Washer М12 DIN 127 5. Clap for nut М12 3. Washer М12 DIN 125 Fig. 11. Attachment of the upper module of the turnstile. Installation instructions...
Page 24
4.2.13. Install the fluoroplastic bushing onto the lower axle, install the rotatory wicket door onto the lower axle of the rotor fixture fixed in the concrete base. Attach the rotatory wicket door to the upper module with the help of 6 bolts M12. Full-height turnstile Oxgard Praktika Т-10 (T-10H)
PROTECTING THE FUTURE The upper cover shall be attached to the upper module by means of four nuts (4) and four washers (Fig. 13). Four pins for fixing the upper cover are located internally of the cover. Fig. 13. Fixture of the upper cover 5.
Page 26
PROTECTING THE FUTURE 12 V 220 V Fig. 14. Full-height turnstile Oxgard Praktika Т-10 (T-10H)
Page 27
PROTECTING THE FUTURE CB and ACS shall be connected via the cross-board. Fig. 15 shows an arrangement of the cross-board on the upper module of the turnstile. Check if the cables are reliably connected. Install the doors and lock them. Подключение...
The CB is connected to a group of terminals Control Board at the cross-board. The terminals are marked as: 12V, CL, CH, GND. The CB shall be connected as per terminal labeling listed in Table 4. Full-height turnstile Oxgard Praktika Т-10 (T-10H)
PROTECTING THE FUTURE Table 4. Labeling of the terminals for connecting the CB Labeling of the Color terminals of the wire Yellow Green Blue 5.2. Connection of the access control system (optionally) The ACS controller is connected to the group of the terminals: Access Control System at the cross-board.
Page 30
J1 (Fig. 16). In this case the mode for passage to left/right is switched only for the time of supplying a control signal to the inputs LEFT/RIGHT. The mode of free passage can be set by simultaneously Full-height turnstile Oxgard Praktika Т-10 (T-10H)
Page 31
PROTECTING THE FUTURE supplying control signals to both inputs. The priority of the inputs LEFT and RIGHT when switching into the pulse mode remains unchanged. The cross-board is designed with two relay outputs for ACS which operate under the “dry contact” principle, namely PassOk1 and PassOk2. NO and COMM means normally opened connection, NC and COMM means normally closed connection.
Table 6, with the board buttons numbered as shown on Fig. 17. This group of contacts should have an output current of 150 mA at most, with maximum allowable voltage 24 V. Fig. 17. Numeration of the control board buttons Full-height turnstile Oxgard Praktika Т-10 (T-10H)
Page 33
PROTECTING THE FUTURE Table 6. Designation in the group of I/O contacts Labeling of Designation of terminals the terminals I/O1 Status of the button “Left” (1, Fig. 17) I/O2 Status of the button “Right” (3, Fig. 17) I/O3 Status of the button “Stop” (2, Fig. 17) I/O4 Status of the button “Antipanic”...
Page 34
5.3 of the Instructions). In this case ACS is responsible for these modes. Cross- board Fig. 19. Diagram for connection of CB to the ACS controller Full-height turnstile Oxgard Praktika Т-10 (T-10H)
PROTECTING THE FUTURE Appendix 1. Short summary of the data transmission bus CAN2.0 The CB is operated by the up-to-date noise-resistant bus under the standard CAN2.0. According to the standard CAN2.0 the length of the cable for transmitting signals can reach more than one kilometer, but correct operation at such distances depends on many factors.
PROTECTING THE FUTURE Appendix 2. Arrangement of the installation openings relative to the external dimensions of the turnstile Fig. 20. Arrangement of the installation openings relative to the external dimensions of the turnstile Full-height turnstile Oxgard Praktika Т-10 (T-10H)
Page 37
PROTECTING THE FUTURE Fig. 21. Sample for turnstile installation Installation instructions...