Oxgard Praktika T-04 Installation Manuallines

Speedgate
Hide thumbs Also See for Praktika T-04:

Advertisement

Quick Links

Praktika T-04(K) speedgate
Installation
guidelines
www.oxgard.com
info@oxgard.com
Tel.+7(812) 366-15-94

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Praktika T-04 and is the answer not in the manual?

Questions and answers

Summary of Contents for Oxgard Praktika T-04

  • Page 1 Installation guidelines Praktika T-04(K) speedgate www.oxgard.com info@oxgard.com Tel.+7(812) 366-15-94...
  • Page 3: Table Of Contents

    Content 1. Basic specifications .................. 5 2. Product design ..................6 3. Safety requirements ................10 4. Installation of speedgate ................. 11 4.1. Required equipment ................ 11 4.2. Installation of speedgate ..............12 5. Connecting the speedgate ............... 15 5.1. Connecting power supply ..............16 5.2.
  • Page 4 List of abbreviations – power supply – fire alarm – remote control – access control system – operating device (turnstile) – normally connected – normally opened Speedgate firmware version FW v2.0-2.2 Praktika T-04(K) speedgate...
  • Page 5: Basic Specifications

    Card collector firmware version FW v1.52 1. Basic specifications Table 1 Basic specifications Description Speedgate RC panel Dimension of side unit with open wings 1140х1500х200 107х107х25 (mm) (HхWхL) Dimension of side unit depending on passage lane (mm) 107х107х25 1140х1500х500 1140х1500х620 Weight of side unit depending on passage lane, kg 110,0...
  • Page 6: Product Design

    Additionally the card collector can be integrated in the design of the speedgate. Base covers for access to PU, RC and ACS cables holes (Fig. 1) are provided at the bottom of side units. Praktika T-04(K) speedgate...
  • Page 7 Speedgate may have only a single passage, however an unlimited number of passages can be arranged with the use of side units and middle units, depending on customer requirements. Fig. 1 General view of speedgate Several speedgates set a required pass zone when mounted in a row. In this case side and middle units should be used (Fig.
  • Page 8 Display panel of the speedgate is made of artificial stone with an insertion made of acrylic glass. Speedgate operating modes are displayed on the panel in the form of mnemonic signs depicting authorization and non-authorization (Fig. 3). Praktika T-04(K) speedgate...
  • Page 9 Fig. 3 General view of LED panel display Remote Control Panel The housing of RC panel is made of polished stainless steel. On the front side there are control buttons and LED indicators of RC operational modes (Fig. 3). The standard supplied cable is 5 m long. Fig.
  • Page 10: Safety Requirements

    • Set the power supply unit inside the speedgate housing as this could lead to electric shock to persons; • Set the speedgate other than in dry and heated places; • Impede or accelerate the speedgate wings; • Apply chemically aggressive cleaning detergents as pastes and liquids. Praktika T-04(K) speedgate...
  • Page 11: Installation Of Speedgate

    4. Installation of speedgate CAUTION: The speedgate should be installed securely to avoid swinging and (or) overthrow during operation. In case of installation on the low strength floors - take action to strengthen the floor at the installation site. Before checking operability of the speedgate carefully read this section of the Regulations.
  • Page 12: Installation Of Speedgate

    Location of mounting holes related to the outer dimensions of the speedgate and its dimensions are shown in Appendix 4. Depth of the hole should exceed the length of the anchor for more than 5mm. Put anchors in the holes. Praktika T-04(K) speedgate...
  • Page 13 4.2.4. Cable routing is carried out through holes of 50 mm diameter (Fig. 5) in the lower plate of side units. Fig. 5. Linkage dimension with 660 (900) mm passage width 4.2.5. Open the box and unpack: • side units; •...
  • Page 14 Fix the housing of side unit with 12 screws M10, tightening them to the corresponding anchors by using a wrench with internal hexagon S10. 4.2.10. Remove protective film from the housing of the speedgate. Praktika T-04(K) speedgate...
  • Page 15: Connecting The Speedgate

    5. Connecting the speedgate Connection of RC, PS and ACS is performed with the use of motherboard. Figure 7 shows the location of motherboard at the front of the side unit. Fig. 7 Location of motherboard on the side unit Figure 8 depicts the motherboard and connectors for PS, RC, ACS and FA.
  • Page 16 Status of the buttons is transmitted to the outputs I / O1 ... I / O4 (see article 5.4) - Jumper J3 is not used - Jumper J4 is used to establish the normal operation of CAN2.0 bus. See Appendix 1. Praktika T-04(K) speedgate...
  • Page 17: Connecting Power Supply

    5.1. Connecting power supply CAUTION! Do not use power supplies with an output current less than 5A. For each side unit must be a separate power supply. Do not install the power supply at a distance more than 25 meters from the speedgate.
  • Page 18: Connecting Side Units

    Table 4 Marking of PS contacts Contacts marking Wire color Yellow Green Blue 5.3. Connecting side units Connecting pattern for two side units is shown in Fig. 9. In case you need to increase the number of passes, it shall be cascaded Praktika T-04(K) speedgate...
  • Page 19 Fig. 9 Connection pattern of side units For normal operation of the entrance with two passages, perform the following: combine two side units (A and C) and one middle unit B, with two three-wire buses CAN-2 (first bus CAN2.0 and second bus CAN2.0). See Fig.
  • Page 20: Connecting Access Control System (Optional)

    Card collector can be installed only at the factory! 5.4. Connecting access control system (optional) ACS controller is connected to AccessControlSystem contact set on motherboard. Marking of contacts: LEFT, RIGHT, STOP, AP, GND. Contact assignment shown in table 5. Praktika T-04(K) speedgate...
  • Page 21 Table 5. ACS contacts assignment Contacts assignment Contacts marking single pass left / right LEFT, RIGHT (lowest priority) non-authorized pass (mode "Stop") STOP (medium priority) opening of wings ("anti-panic") (highest priority) common contact Inputs for ACS connecting differ on priorities: •...
  • Page 22 Motherboard contains relay output for ACS operating on the principle of "dry contacts» - Status. NO and COMM - normally open connection, its contacts close when the speedgate switches to "AP" and D3 LED indicator lights up. Praktika T-04(K) speedgate...
  • Page 23 Also the motherboard contains following LED indicators: D4 indicates a signal to the «LEFT» input. D5 indicates a signal to the «RIGHT» input. D6 indicates signal to the «STOP» input. D7 indicates a signal to the «AP» input. 5.5. Connecting RC panel to ACS controller In some cases RC shall be connected directly to the ACS controller as the passages allowed from the remote (without controller) are regarded by the system as a "forced entry".
  • Page 24 I / O1 ... I / O3 outputs show the current status of the RC panel buttons, i.e. transistor is opened by pressing the corresponding button. The I / O4 output changes its state to the opposite every time the "antipanic" button is pressed. Praktika T-04(K) speedgate...
  • Page 25 I / O1 ... I / O4 outputs can be connected either directly to the ACS controller or via relay. When using the relay it is necessary (!) to connect diode in parallel with the relay coil (Fig. 11). Fig. 11 Connection of diode in parallel with relay coil Connection of RC panel to ACS controller is shown in Fig.
  • Page 26: Card Collector Description

    Customer can choose reader model suitable for the existing system. The reader is mounted on a universal adjustable bracket, located under the top cover of the card collector. This solution provides maximum flexibility for installation and connection of the card collector. Praktika T-04(K) speedgate...
  • Page 27 Connection of PU, EU and ACS is performed via card collector board. To do this, open the hatch with a key. Figure 13 depicts the location of the board on the card collector stand. Fig. 13 General view of the card collector Fig.
  • Page 28: Connecting Power Supply

    Connect (+) and (-) contacts of power supply to (+ 12V) and (GND) contacts on the board respectively (Fig. 14). When the card collector board is powered, D11 LED indicator will turn on. Make sure that cable is connected securely. Praktika T-04(K) speedgate...
  • Page 29: Connecting Operating Device

    6.3. Connecting operating device Connection of OD to the card collector is performed with the use of two contact sets: "Let Go" and "Pass Ok-GND". Contacts location is shown in Fig. 14 6.3.1. "Let Go" contact set NC, NO, and COMM contacts. Relay output operating on a "dry contact" principle, which closes / opens, transmitting passage authorizing signal to OD.
  • Page 30: Connecting Of Acs Controller

    2 seconds after putting the card into the card hole of the card collector, otherwise it will be ignored. After receiving the signal within the mentioned time interval card collector opens the shutter and the card is collected. If card collection is confirmed by internal sensors, card collector Praktika T-04(K) speedgate...
  • Page 31 generates a signal to the OD via "Let Go" contact set (see. article 6.3.1) and to ACS via "Card Inside" contact set. In such case a green arrow indicator on the LED panel turns on. 6.4.2. "Free Pass-GND" contact set (signal for passage authorization). Free Pass and GND contacts.
  • Page 32: Installation Of Proximity Card Reader

    6.5. Installation of proximity card reader MatrixIII proximity card reader is used as an example of installation. Installation of other models of readers may differ. 6.5.1. Undo the M4 screw at the rear of the card collector (Fig. Praktika T-04(K) speedgate...
  • Page 33 Панель LED panel индикации Fig. 15 6.5.2. Slide the LED panel to the stop in the direction indicated in Fig. 15. Carefully lift the panel. 6.5.3. Remove two M4 screws (8, Fig. 16) and remove the universal bracket for readers (2, Fig. 16). 6.5.4.
  • Page 34 CAREFULLY (!) set the LED panel in its original position. Tighten the M4 screw. CAUTION! When installing the LED panel in its original position, make sure that wires of optical sensors mounted on the guiding bars for cards will not be damaged by other elements. Praktika T-04(K) speedgate...
  • Page 35 Fig. 16. Installation of proximity card reader Fig. 17 Recommended option of card reader installation Installation guidelines...
  • Page 36: Appendix 1. Summary Of The Data Bus Can2.0

    It is not required, however, in case of connection of two RC panels, because required 120 ohm resistors are already installed at the ends of the bus (in RC panels). A special RC panel is required to operate several speedgates simultaneously. Standard RC is not appropriate for this purpose. Praktika T-04(K) speedgate...
  • Page 37 Fig. 18 Installation guidelines...
  • Page 38 1* and 2* are drawn by dotted lines. This scheme features two readers. The second reader shall be installed outside the card collector, which is not always aesthetically and practically acceptable. If installed close to each other, proximity readers can create mutual interference. Praktika T-04(K) speedgate...
  • Page 39 Fig. 20 Block diagram №2 Fig. 20 shows a more advanced but also a more high-cost circuit connection. The advantage of this scheme is that it uses only one reader installed in the card collector. Wiegand interface provides a possibility to connect several identical ACS controllers to one reader in parallel.
  • Page 40 #2. It reduces the cost of installed system. For this purpose the controller with two output signals to one input of a reader (i.e., the controller can distinguish the guest cards and permanent cards transmitting a signal to the corresponding output) is used. Praktika T-04(K) speedgate...
  • Page 41: Appendix 3. Location Of Mounting Holes In Relation To The Overall

    Appendix 3. Location of mounting holes in relation to the overall dimensions of the speedgate Fig. 22 Location of mounting holes in relation to the overall dimensions of the speedgate Installation guidelines...
  • Page 42 Fig. 23 Dimensions of speedgate depending on passage lane (top view) Praktika T-04(K) speedgate...
  • Page 43: Appendix 4. Block Diagram Of Minimal Connections For Synchronized Operation Of Wings With The Use Of One Rc Panel

    Appendix 4. Block diagram of minimal connections for synchronized operation of wings with the use of one RC panel Fig.24 Block diagram of minimal connections for synchronized operation of wings In order to secure stable operation of the speedgate unit one GND terminal of one unit shall be connected to another GND terminal of another speedgate unit.
  • Page 44 Oxgard 192289 Saint Petersburg Sofiyskaya st., 66 Tel./fax +7 (812) 366 15 94 www.oxgard.com info@oxgard.com...

This manual is also suitable for:

Praktika t-04k

Table of Contents