Download Print this page

Handy Home Products VALUE Series Assembly Manual page 55

8-5/8" 244 x 296 cm

Advertisement

• Follow directions provided by manufacturer and these instructions.
Familiarize yourself with a 3-Tab Shingle.
Half A Rain Slot
BEGIN
1
Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.
Starter row must be straight and level all the way across with lower edge of roof deck.
NOTE: If you have installed drip edge install shingles flush to drip edge.
FRONT OF
SHED
Shingle overlaps
roof decking.
2
2
Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge.
Roof Deck
FRONT OF
SHED
1"
(2,5 cm)
Notch
- or -
Drip Edge
Notch
SHINGLES
- NOT INCLUDED -
Notch
SHINGLE NAIL PATTERN
1"
(1,3 cm)
(2,5 cm)
Full Rain Slot
NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
(4) Nails
Flush with starter row.
Notch
1/2"
Sealing Strip
NAILS
TABS UP
1" (2,5 cm) overhang
past roof deck.
Flush with starter row.
53
1"
(2,5 cm)
BACK OF
SHED
1" (2,5 cm) overhang or
flush with drip edge.
BACK OF
SHED

Advertisement

loading

This manual is also suitable for:

Value montana 8' x 9'Montana