Download Print this page

Handy Home Products VALUE Series Assembly Manual page 28

8-5/8" 244 x 296 cm

Advertisement

PARTS REQUIRED:
x1
LG
2 x 3 x 12-1/4" (5 x 7,6 x 31 cm)
x1
96" (244 cm) Z-STRIP - Cut into two 29" (73,7 cm) lengths
Place left panel on front frame flush to right panel as shown with primed
5
side facing up.
6
Repeat Steps 3-4.
FINISH
You have finished the lower front wall.
7
OZ
Primed side UP
1"
(2,5 cm)
FRONT WALL PANELS
Z-Strip
2" (5 cm)
Finish nails
(73,7 cm)
1"
(2,5 cm)
6" (15,2 cm)
apart at edges
Flush
LG
x2
x16
x6
29"
2" (5 cm)
Nails
12-1/4"
1"
(31 cm)
(2,5 cm)
26
3" (7,6 cm)
2" (5 cm)
2" (5 cm)
LG
Angle nails to
draw panels
tight at seams

Advertisement

loading

This manual is also suitable for:

Value montana 8' x 9'Montana