Now is a good time to install accessories such as wire management, CPU holders, keyboard trays, or anything
else that fastens to the bottom of your desk. This section will cover accessories that are included with this
Frame. For additional accessories, refer to the instructions that came with those accessories.
© UPLIFT Desk • 800-349-3839 • 512-614-3152 • info@upliftdesk.com • upliftdesk.com
ACCESSORY INSTRUCTIONS
Desk Cable Management:
Use the included Cable mounts (H9) to organize your
wires, keep a clean presentation, and prevent any wires
from snagging on anything when adjusting height. The
Cable mounts work best when stuck directly to the
metal desk frame. Attach Cable mounts to the inside
of frame parts. You might want to save some for once
you have everything on your desk plugged in.
Installing Wire Management Tray:
If you will have a lot of wires to wrangle, install the Wire
management tray while assembling your desk. Assess
where your wires may be concentrated. Move it un-
til you find the placement you want, and make a pencil
mark at each hole's location.
Attach tray to your desk using two (2) #10x5/8'' Wood
screws (H14).
If you own a drill, you can make pilot holes to make this
a little easier. Use it with a 1/8" diameter drill bit and,
ensuring that you DO NOT DRILL DEEPER THAN 1/2",
drill pilot holes where you've made your marks.
Step 14
Double check that all accessible screws on the desk
are tight.
And then check all screws again and make sure they're
tight. This isn't a typo, it's important and it's far easier to
tighten them with the desk upside down than it is later.
Be careful not to miss the screws marked with an ar-
row in the diagram.
9
Need help?
Do you have a question about the V2 Standard 4-Leg Height Adjustable Frame and is the answer not in the manual?
Questions and answers