Daedong DSC62 Manual page 138

Combine
Table of Contents

Advertisement

8-40 DSC62
adjuSting the crawler
tenSiOn
(1) Front Wheel
(3) Locking Nut
(2) Tension Bolt
(A)13~18 mm
1. Loosen the locking nut and
tighten the crawler tension bolt.
2. Jack up the rear frame of the
combine. Then, adjust the gap
between the second front wheel
and the crawler to be 13~18
mm.
3. Ensure that the both crawlers
must have the same tension.
nd
Gap between the 2
front wheel and crawler
DSC62-영문판-8장.indd 40
adjuSting the beltS
Adjust each belt's tension with an adjusting bolt or cable bolt to maintain
the proper return spring length as shown in the following table.
no.
Engine Unit
E32O802A
Threshing
Unit
10 Cutter Drive Belt
13 ~ 18
mm
Specifica-
belt
1 Transmission Drive belt
REC C46
2 Threshing Drive Belt
3 Reaping Drive Belt
4 Threshing Rotor Drive Belt
5 Blower Drive Belt
6 No.1 Drive Belt
7 No.2 Drive Belt
8 Oscillator Drive Belt
Straw Discharge Chain
9
Drive Belt
length of
quantity
tion
spring
2
193mm
C38.5
2
143mm
TB 53
1
102mm
TB 144
3
286mm
TB 66
1
-
TB 109
1
160mm
TB 108
1
165mm
TB 42
1
396mm
TB 38
1
145mm
TB 55
1
165mm
2012-04-17 오후 5:36:33

Advertisement

Table of Contents
loading

Table of Contents