INITIAL START-UP

13. Fill Cooking Pot with cooking oil and
place in unit.
14. Lower Element into Cooking Pot and
hang Platform on Platform Lift Arm.
Oil fill should be at cold level. Add or
remove oil as needed.
15. Close and latch the Access Door.
16. Turn circuit breaker ON or install fuse.
17. Press the power ON button. The
POWER light and the Heat On indica-
tor light will illuminate.
18. Set Time and Temperature. For
detailed instructions refer to the Con-
troller Basic Programming in Section
6, CONTROL PANEL.
19. Verify the function of the unit by per-
forming a cooking cycle without prod-
uct. For detailed instructions refer to
the Cooking section of Section 8,
PRODUCT PREPARATION AND
COOKING.
VF2 - 14 lbs