Maintenance Work - Wacker Neuson IEC Operator's Manual

Internal vibrator
Table of Contents

Advertisement

11.3

Maintenance work

WARNING
A damaged machine part, protective hose or power cable can result in personal injury
caused by electric current.
Working in the workshop
Perform maintenance work in a workshop on a workbench. This has the following benefits:
Protection of the machine of contamination on the construction site.
A level and clean work surface makes work easier.
There is a better overview over small parts and they are not lost as easily.
Checking the wear dimensions of the vibrator head
Wear dimensions:
Minimum diameter of lower tube øL
Minimum diameter of vibrator head øL at measuring point L
Length of vibrator head L
Wear is highest at the end of the vibrator head.
Let the vibrator head be exchanged by your Wacker Neuson contact if the wear dimensions are reached
at a certain point.
The vibrator head assembly must be replaced by the service department of the Wacker_Neuson contact
partner.
Machine
type
IEC38
IEC45
IEC58
Dimensions in bold are wear dimensions.
Dimensions in brackets are original dimensions of new machines.
100_0101_mt_0018.fm
Do not operate a damaged machine.
Have a damaged machine repaired immediately.
L
Dimensions for vibrator head and lower tube [mm]
øL
L
L
L
33 (38)
275 (285)
38 (45)
315 (327)
50 (58)
390 (400)
L
øL
L
35 (38)
180
42 (45)
194
54 (58)
205
11 Maintenance
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents