Assembly And Installation; Assembly - EMG ELDRO EdEx Series Assembly Manual

Electro-hydraulic lifting thruster
Table of Contents

Advertisement

6

Assembly and installation

6.1

Assembly

ELDRO-EdEx-Montageanleitung-607338-EN.docx
The following safety regulations must be adhered to before beginning
any work on EdEx thrusters:
Ensure that the industrial system is shut down
De-energise the system
Safeguard the system to prevent it being switched on again
Test to ensure a de-energised state
Earth and short-circuit
Cover or isolate adjacent live parts
The EdEx thruster may only be assembled by specialists (e.g.
industrial mechanics/electricians) with many years of experience.
Assembly and connection of the EdEx thrusters must be carried out
by persons with expert knowledge of explosion protection.
Only the intended connections may be used.
WARNING
Cylinder movements
Risk of crushing between surrounding hindrances and the cylinder
or connected components.
– When assembling, ensure sufficient free space to prevent
crushing.
– Take alternative measures to safeguard this hazard point.
CAUTION
The EdEx thrusters weigh between 30 and 90 kg
Risk of injury when lifting the load manually.
– Use suitable lifting equipment (e.g. crane).
– Never remain below suspended loads.
– Use a transport aid (e.g. lifting carriage) with sufficient load
bearing capacity.
Assembly and installation
6
Assembly
6.1