Installing The Switch; Installing The Switch Into A Rack - Supermicro SSH-C48Q User Manual

Rack installation for switch
Hide thumbs Also See for SSH-C48Q:
Table of Contents

Advertisement

Rack Installation for Supermicro Switch SSH-C48Q
3-4

Installing the Switch

Installing the Switch into a Rack

Installing the Switch
1. Confi rm that inner rails have been secured to the switch.
2. Confi rm that the outer rails are installed on the rack.
3. Align the ends of the inner rails on the switch with the front of the outer rails
on the rack.
4. Slide the inner rails into the outer rails, keeping the pressure even on both
sides (you may have to depress the locking tabs when inserting). When the
switch has been pushed completely into the rack, you should hear the locking
tabs click into the locked position.
5. (Optional) Insert and tighten the thumbscrews which secure the front of the
switch to the rack.
Note: Your switch may differ from the illustrations in this manual.
Figure 3-5: Installing the Switch into a Rack
3-6

Advertisement

Table of Contents
loading

Table of Contents