Assembly Instructions; If Missing Parts Call; Parts List; Hardware Bag - Confer Plastics ROLL-GUARD 7200 Assembly And Installation Manual

A-frame ladder for rigid-framed pools only
Table of Contents

Advertisement

Model #7200 "ROLL-GUARD" A-FRAME LADDER
For Rigid-Framed Above Ground Pools
ASSEMBLY INSTRUCTIONS - PLEASE READ BEFORE ATTEMPTING ASSEMBLY
Right Bridge
Adjustable
Brace
Outside
Right Rail
(OR)
Outside
Left Rail
(OL)
If missing parts call - Toll free U.S./Canada - 866-396-2968 or www.conferladders.com

Parts List

4 - Handrail
1 - Deck
1 - Left Bridge with lock assembly
1 - Right Bridge
2 - Adjustable Brace
10 - Ladder Tread

Hardware Bag

4 - Plug
6 - #10 x 1-1/4" Self Tapping Screw
2 - 1/4 - 20 x 3-1/2" Bolt
1 - Instruction sheet
:
Helpful Hints
1). Assemble the ladder by laying it down on a smooth flat surface.
2). All ten treads are the same, but must be installed tab marked minus [-] into tread lock
opening marked minus [-] and tab marked plus [+] into tread lock opening marked
plus [+] on the rails. TREADS MUST NOT BLOCK THE ROLL-GUARD TRACKS
LOCATED ON THE INSIDE AND OUTSIDE RAILS.
3). The roll-guard locking assembly is pre-installed on the left bridge.
4). Slide the roll-guard into track, grab handle first.
Inside Left Rail (IL)
1 - Roll Guard
1 - Outside Left Rail (OL)
1 - Outside Right Rail (OR)
1 - Inside Left Rail (IL)
1 - Inside Right (IR)
2 - 1/4" Flat Washer
2 - 1/4" Hex Nut
1 - Padlock
Handrails
Deck
Roll-guard
Left Bridge
Treads
Inside
Right Rail
(IR)
Tools Needed for Assembly
1 - Rubber Mallet
1 - Cordless Drill w/Phillips Driver
1 - Garden Hose
1 - 1/4" Drill Bit
1 - Phillips Screwdriver
1 - Pliers

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ROLL-GUARD 7200 and is the answer not in the manual?

Questions and answers

Table of Contents