A-frame ladder. adjusts to fit pools 48 inch to 54 inch. ladder must be attached to pool frame - do not use with inflatable pools. swing up section of ladder must be installed on outside of pool weight limit 300 lbs. (6 pages)
Summary of Contents for Confer Plastics ROLL2GUARD 9300
Page 1
WARNING To reduce the risk of drowning, entrapment, falls, paralysis, electrocution, or other serious injury or death: Dealer/Installer: Give manual to homeowner. Installer: Read “Safe Installation” on page #2 and all instructions before beginning. For proper assembly and installation, instructions must be followed completely. Homeowner: Read “Safe Use”...
Page 2
MODEL #9300 “ROLL2GUARD®” ENTRY SYSTEM If missing parts call - Toll free U.S./Canada - 800-635-3213 or www.onferplastics.com Tube Rail Platform/Deck Parts List: Hardware List: 6-00-93MR 6-00-93D 5 - Treads 8 - 1/4 - 20 2” Bolt Handrail 1 - Bottom Tread 14 - 1/4”...
Page 3
9300 ladders to the 9300 to a deck and Use the 9300 with create an A-frame style drop it into the pool. a Confer Plastics Step entry system. (CCX-AG or Step-1X) for ground to step entry system. Determining The Height:...
Page 4
Verify installation height and configuration before starting installation of ladder. Assembly and installation instructions are specific for each installation height and configuration. Refer to Page 3 for a guide on installation heights and determining your configuration! STEP 1: Tools needed: Rubber Mallet Parts needed: Sidewalls, Treads, Bottom Treads, LADDER BODY &...
Page 5
Depending on the installation position or height of your 9300, the Tambour MAY NEED TO BE CUT. REVIEW PAGE #3 9300 INFORMATION SHEET TO DETERMINE YOUR INSTALLATION HEIGHT AND CONFIGURATION! IF YOUR 9300 IS INSTALLED AT A IF YOUR 9300 IS INSTALLED 48”...
Page 6
STEP 2: Installing the Tambour Determine your installation height and configuration using the pictures and diagrams below. Take your time and read the instructions thoroughly before cutting. An incorrect cut cannot be reversed and will impact the installation. If you cut it incorrectly, it may render the tambour unusable and compromise the installation.
Page 7
Make sure you have correctly identified your installation position and height. Take your time and read the instructions thoroughly before cutting. An incorrect cut cannot be reversed and will impact the installation. If you cut it incorrectly, it may render the tambour unusable and compromise the installation.
Page 8
Make sure you have correctly identified your installation position and height. Take your time and read the instructions thoroughly before cutting. An incorrect cut cannot be reversed and will impact the installation. If you cut it incorrectly, it may render the tambour unusable and compromise the installation.
Page 9
STEP 2B: continued IF YOU ARE INSTALLING YOUR 9300 TO 48”, SKIP STEPS ABOUT BOOT ASSEMBLY AND PROCEED TO STEP 3B Tools needed: Screwdriver Parts Needed: Sidewall Extensions, Bottom Tread Hardware needed: 8 x 2” bolts, 8 x nuts #4: Determine the height for your 9300 installation: 55”, 57.5”, or 60”.
Page 10
STEP 2C: Installing the Tambour for Inside 9300 Installations of 55”- 60” Tools needed: Screwdriver Parts Needed: Sidewall Extensions, Bottom Tread Hardware needed: 8 x 2” bolts, 8 x nuts, 2 x #10 3/4” screws 55” 57.5” 60” #3: Determine the height for your 9300 installation: 55”, 57.55”, or 60”.
Page 11
Verify installation location before starting Step 3. Refer to Page 2 for a guide on installation heights and determining your configuration! THE INSTALLATION IS DIFFERENT DEPENDING ON IF YOUR 9300 IS GOING INSIDE OR OUTSIDE THE POOL! STEP 3A: Installing the 9300 48” In-Pool Installation Tools needed: Screwdriver Parts needed: 2 Tube Rails, 2 tubes, 2 mounting blocks.
Page 12
Verify installation location before starting Step 3. Refer to Page 2 for a guide on installation heights and determining your configuration! THE INSTALLATION IS DIFFERENT DEPENDING ON IF YOUR 9300 IS GOING INSIDE OR OUTSIDE THE POOL! STEP 3B: Installing the 9300 as Ground to Step Tools needed: Screwdriver Parts needed: 2 Tube Rails, 2 tubes, 2 mounting blocks.
Page 13
Verify installation location before starting Step 3. Refer to Page 2 for a guide on installation heights and determining your configuration! THE INSTALLATION IS DIFFERENT DEPENDING ON IF YOUR 9300 IS GOING INSIDE OR OUTSIDE THE POOL! STEP 3C: Installing the 9300 55-60” In-Pool Tools needed: Screwdriver Parts needed: 2 Tube Rails, 2 tubes, 2 mounting blocks.
Page 14
Step 4 is only for A Frame style installations. STEP 4: Installing 2x 9300 as A Frame style Tools needed: Screwdriver Hardware needed: 6 1” bolts, 6 hex nuts #2: Verify that the 9300 platform is as #1: Begin by placing your “inside” 9300 into the pool.
Page 15
Operating & Securing the Tambour To close & secure the 9300: Grasp To open the 9300: the handle and pull the tambour down Remove the lock. Lift up the tambour and slide to open until it bottoms out. Secure by running position.
Page 16
A PICTURE [S] OF DEFECTIVE PART, A BRIEF DESCRIPTION OF PROBLEM, PROOF OF PURCHASE AND YOUR CONTACT INFORMATION. INFORMATION MAY ALSO BE FAXED TO CONFER PLASTICS AT: 716-694-3102 OR MAILED TO THE ADDRESS BELOW. UPON REVIEW OF THE INFORMATION YOU WILL BE NOTIFIED IF PART IS COVERED UNDER THE WARRANTY AND THE SHIPPING/HANDLING CHARGES.
Need help?
Do you have a question about the ROLL2GUARD 9300 and is the answer not in the manual?
Questions and answers