5000000000000100 - Server Core File Detected - Oracle E5-APP-B Alarms And Maintenance

Eagle lnp application processor
Hide thumbs Also See for E5-APP-B:
Table of Contents

Advertisement

Alarms and Maintenance
Relative Humidity
Elevation
Heating, Ventilation, and Air Conditioning
Note: Be prepared to wait the appropriate period of time before continuing with the next step.
Conditions need to be below alarm thresholds consistently for the alarm to clear. The alarm may
take up to five minutes to clear after conditions improve. It may take about ten minutes after the
room returns to an acceptable temperature before syscheck shows the alarm cleared.
3. Verify that the temperature in the room is normal. If it is too hot, lower the temperature in the room
to an acceptable level.
Note: Be prepared to wait the appropriate period of time before continuing with the next step.
Conditions need to be below alarm thresholds consistently for the alarm to clear. It may take about
ten minutes after the room returns to an acceptable temperature before the alarm cleared.
4. Run syscheck to see if the alarm has cleared
• If the alarm has been cleared, the problem is resolved.
• If the alarm has not been cleared, continue with the next step.
5. Replace the filter (refer to the appropriate hardware manual).
Note: Be prepared to wait the appropriate period of time before continuing with the next step.
Conditions need to be below alarm thresholds consistently for the alarm to clear. It may take about
ten minutes after the filter is replaced before the alarm cleared.
6. Run syscheck to see if the alarm has cleared
• If the alarm has been cleared, the problem is resolved.
• If the alarm has not been cleared, contact
health check output.

5000000000000100 - Server Core File Detected

This alarm indicates that an application process has failed and debug information is available.
Recovery
E76220 Revision 1, July 2016
Platform and Application Alarms
Exceptional Operating Limit: 0 degrees C to 50
degrees C
Storage: -20 degrees C to 60 degrees C
Operating: 5% to 85% non-condensing
Storage: 5% to 950% non-condensing
Operating: -300m to +300m
Storage: -300m to +1200m
Capacity must compensate for up to 5100
BTUs/hr for each installed frame.
Calculate HVAC capacity as follows:
Determine the wattage of the installed
equipment. Use the formula: watts x 3.143 =
BTUs/hr
My Oracle Support (MOS)
and provide the system
85