Download Print this page

Suzuki LT80K4 Setup Manual page 36

Advertisement

Available languages

Available languages

SAFETY CHECK OUT
!
After completion of the setting-up the vehicle
all the following items should be dou-
ble-checked to confirm that the operation and
function of the vehicle are satisfactory. Now,
setting-up the vehicle and pre-delivery inspec-
tion have been completed and the vehicle can
be passed to the customer.
ENGINE AND TRANSMISSION
ITEM
MEASURE
Engine oil
Check/Fill
Transmission oil
Check/Add
Engine oil pump
Air bleed
Fuel tank
Drain/Fill
Throttle cable
Check/Adjust
Idle r/min
Check/Adjust
Exhaust system
Leakage
Fuel system
Circlip/Leakage
connection
CHASSIS
ITEM
MEASURE
Brake lever
Check/Adjust
Brake pedal
Check/Adjust
All necessary
Oiling points
points
Battery
Filling electrolyte
Wiring and cable
Routing/Operation
Wiring connectors
Clean/Tight
Suspension(s)
Operation
Tighten all nuts
Torque those listed
in this manual
and bolts
Cotter pins and
Fasteners, Check
circlip
Switch Operations
Ignition switch
Engine stop switch
Starter button
SPECIFICATIONS
Parking brake switch
1.2 L
(0.3/0.3 US/lmp gal)
80 ml
(2.7/2.8 US/lmp oz)
Engine
6.0 L
(1.6/1.3 US/lmp gal)
Transmission
3.0–5.0 mm
Brake
(0.12–0.20 in)
Steering
1 450–1 750 r/min
Control cables
Leakage
Suspension
Parking brake lever
SPECIFICATIONS
12–14 mm
(0.5–0.6 in)
15–25 mm
(0.6–1.0 in)
35
COLD TIRE INFLATION PRESSURE
FRONT
15 kPa
2
0.15 kg/cm
2.2 psi
ELECTRICALS
ITEM
ROAD TEST INSPECTION
ITEM
Starting/Acceleration/
Smoothness/Noise
Operation/Noise
Front/Rear, Operation/Noise
Stability
Operation/Proper return
Fuel/Oil/Exhaust
Front and Rear, Operation
Operation
REAR
20 kPa
2
0.20 kg/cm
2.9 psi
CHECK FOR
Operation
CHECK FOR

Advertisement

loading