Siemens LME7 Series Basic Documentation page 76

Burner control
Hide thumbs Also See for LME7 Series:
Table of Contents

Advertisement

Key to phases
Building Technologies Division
Infrastructure & Cities Sector
Phase
Function
number
LOC
Lockout shutdown phase
OFF
Standby, waiting for heat request
oP:P1
Part 1: Request load controller OPEN
Part 2: Switching point fuel valve 2a (2nd stage) ON by actuator
Part 3: High-fire reached
Part 4: Request load controller CLOSE
Part 5: Switching point fuel valve 2a (2nd stage) OFF by actuator
Part 6: Low-fire reached
10
Actuator travels to the CLOSED position, home run
21
Safety valve ON, air pressure switch in no-load position
Check if POC is closed, actuator travels to the CLOSED position
22
Part 1: Fan motor ON
Part 2: Specified time air pressure switch
Message (timeout), stabilization of air pressure switch
24
Opening time of actuator (timeout)
30
Part 1: Prepurge time without flame simulation test
Part 2: Prepurge time with flame simulation test (2.1 seconds)
36
Closing time of actuator (timeout)
38
Preignition time
40
Postignition time
42
Flame detection
44
Interval: End of ignition safety time and release of load controller
72
Opening time of actuator (timeout)
74
Part 1: Operation is ended
Part 2: Postpurge time
90
Pressure switch-min open → safety shutdown
Basic Documentation LME7...
13 PME72.521...
76/245
CC1P7105en
29.11.2011

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents