Barco DP2K-19B Installation Manual page 31

Hide thumbs Also See for DP2K-19B:
Table of Contents

Advertisement

A
2
Image 3-12
UPS connection
3. Secure the UPS inlet socket with a fixation spring. Handle as follow:
-
Squeeze the fixation spring together.
-
Slide the fixation spring on the fixation pins while squeezing together and push it against the power plug.
-
Release the fixation spring.
4. Install on the power outlet the second fixation spring to prevent losing it (2).
C
AUTION
AC power supply cord (minimum 0,75 mm² or 18 AWG and minimum 300V)
C
AUTION
R5905067 DPXK-19B/23B/P 17/09/2012
1
:
The electrical connection with the UPS INLET socket of the projector must be done with a certified
:
Do not use the power OUTLET socket of the projector to provide power to other equipment!
B
3. Physical installation
25