VESPA GTS Super 125 i.e. Service Station Manual page 85

Table of Contents

Advertisement

Vespa GTS Super 125 i.e.
Electrical system
7. Electronic control unit
8. Engine stop switch
9. Stop buttons
10. Fuse No. 4
11. Starter button
12. Starter motor
WARNING
ALL CONTINUITY TESTS MUST BE CARRIED OUT WITH THE CORRESPONDING CONNECTORS
DISCONNECTED.
1) Check fuses No. 1,2,3 and 4.
2) Check key switch contacts.
3) Check the contacts of the stop buttons and the starter button.
4) With the key switch set to «ON», the brake pulled and the starter button pressed, check if there is
voltage between the Orange-White cable of the start-up remote control switch and the ground connec-
tion. If there is not, check the cable harnesses.
5) Check the start-up remote control switch.
6) Check that the Red cable between the battery and the start-up remote control switch is not interrupted.
Also check continuity between the latter and the starter motor.
7) Check the starter motor ground connection.
8) Check that the Orange-Blue cable between the start-up remote control switch and the control unit
(pin 24) is not interrupted.
9) Check the contacts of the engine stop switch and that the Green-Black cable connecting this switch
to the control unit (pin 12) is not interrupted.
10) Check the engine stop switch ground connection.
THE FOLLOWING INFORMATION REFER TO THE VERSION EQUIPPED WITH MIU G3 ECU.
ELE SYS - 85

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents