NAiS GT10 Technical Manual page 51

Programmable operator terminal
Hide thumbs Also See for GT10:
Table of Contents

Advertisement

GT10/GT30
CAUTION
Screw tightening torque
The screw tightening torque should be 0.1 N m to 0.25 N m.
Tightening the screws too hard can cause deformation of the front
panel , so that the switch will not function properly. Make sure screws
are tightened to the appropriate degree.
Applicable panel thickness
A panel with a thickness of 1.0 mm to 5.0 mm should be used.
Installation angle and ambient temperature range for usage
If the unit is being installed in a horizontal orientation and the
Matsushita Programmer II and C - NET adaptor are being connected to
the Tool port, please be aware that the ambient usage temperature
should not exceed 40°C/104°F.
Liquid display panel side
Clearance when the GT30 s installed
When installing the GT30, if other parts are being installed to the
panel or cables are being wired to it, we recommend providing a
clearance of 30 mm to 50 mm/1.18 inch to 1.97 inch around the GT30.
This prevents cables from being damaged, and facilitates the
installation work. Also, make sure that the slits in the main unit are
never obstructed.
(Horizontal installation)
Installation panel
Installation and Wiring
2.1
Installation
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt10 ver.2Gt30Gt10 ver.1

Table of Contents