Ep Probe Lengths - FULTON Electropack Series Installation, Operation And Maintenance Manual

Electric steam boiler 18 kw-72 kw
Table of Contents

Advertisement

APPENDIX - A
EP, EU & Dragon
Probe Lengths
1, 2 & 3 Branch Electropack and Dragon
PV PROBE LENGTHS
Pump OFF
Pump ON
Low Water Limiter 1
Low Water Limiter 2
Note: Dimensions mm
Note: Measurement taken from under the hexigon.
PV PROBE LENGTHS
Pump OFF
Pump ON
Low Water Limiter 1
Low Water Limiter 2
PV PROBE LENGTHS
Pump OFF
Pump ON
Low Water Limiter 1
Low Water Limiter 2
FEEDWATER TANK
PROBE LENGTHS
Low Water
Solenoid Valve Open
Solenoid Valve Close
Page 44
Technical Information
1 BRANCH
185 mm
215 mm
270 mm
270 mm
2 BRANCH
185 mm
215 mm
275 mm
275 mm
3 BRANCH
185 mm
215 mm
280 mm
280 mm
EP 18-72
(1-3 BRANCH)
400 mm
215 mm
185 mm
Fulton Ltd
Sheet No. 62 Issue 6
1 Branch
1 Branch
1 Branch
2 Branch
2 Branch
2 Branch
3 Branch
3 Branch
3 Branch
Page 1 of 2
EP18-72-IOMM-2015-7

Hide quick links: