FULTON Electropack Series Installation, Operation And Maintenance Manual page 54

Electric steam boiler 18 kw-72 kw
Table of Contents

Advertisement

APPENDIX - A
High Integrity Probes (stainless steel)
The probe is supplied in two parts, the head and the tip. The tip should be screwed onto the head aligning the slot
in the top of the tip with the hole in the screwed shaft of the head.
Locate the pin provided into the slot/hole and secure with the lock nut.
Using the measurement from the old probe, cut the new probe to length and de-burr. Ensure both measurements
are taken from the underside of the hex. nut on the probe head.
Ensure measurements are
taken from the underside of
the hex. nut on the probe
head.
Fulton Ltd
5 Fernhurst Road, Fishponds, Bristol.
BS5 7FG. England.
Every effort is made to ensure accuracy at time of going to press. However as part of our policy of continual product improvement, we reserve the right to alter specifications without prior notice.
Page 48
Align the hole in the probe
head with the bottom of the
slot in the probe tip.
Locknut
Figure. 3 - High Integrity Water Level Probe
Telephone:
+44 (0) 117 972 3322
Fax:
+44 (0) 117 972 3358
E-mail:
sales@fulton.co.uk
Website:
www.fulton.co.uk
TI-103-WaterLevelProbes-2015-3
Hold the probe head secure
whilst fitting the probe tip.
Locate the pin in the hole/slot
and secure with the locknut.
003
FM 28400
FM 28400
EP18-72-IOMM-2015-7
Fulton Ltd
Page 2 of 2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents