Connecting The Power Cord - 3Com NETBuilder II Installing Instruction

Installing bridge/router for ezbuilt systems and base chassis
Hide thumbs Also See for NETBuilder II:
Table of Contents

Advertisement

2-6
C
2: NETB
HAPTER
UILDER
Connecting the
Power Cord
II 8-S
B
/R
LOT
RIDGE
OUTER
3 Verify that the configurable parameters of your device match the configuration
settings of the CONSOLE port specified in Table 2-1.
Table 2-1 CONSOLE Port Configuration Settings
Characteristic
Baud rate
Databits
Parity
Stop bits
DTR
Duplex
Echo
Flow control
4 Turn on the PC, terminal, or modem.
A power cord is supplied with all NETBuilder II chassis. If the power cord does
not match your requirements, contact your network supplier for assistance.
The AC power switch is marked according to international I/O convention:
When you press the I side, the switch is on; when you press the O side, the
switch is off.
Make sure the power switch is turned off (O), and plug the power cord into the
AC power receptacle on the back of the unit.
Setting
9600
8
None
1
Ignored
Full
Off
X-on/X-off

Advertisement

Table of Contents
loading

Table of Contents