Figure 2-2 Cable Tie Wrap Installation - PESA Cougar Series Open Me First

Switching system
Table of Contents

Advertisement

Open-Me-First
2.1 General Installation Rules Continued:
Cabling Continued:
Use the following rules when cabling a routing switcher system:
1. Lay all cables in their intended positions, separating control, video, and
power cables wherever possible.
2. Provide proper support for each cable during the cabling process. The
use of tie-wraps is recommended as shown in Figure 2-2.
07/96
P/N 81905903820
Installation

Figure 2-2 Cable Tie Wrap Installation

Section 2
page 2.3

Advertisement

Table of Contents
loading

Table of Contents