Equipment Cabling; Figure 2-1 Equipment Chassis Installation - PESA Cougar Series Open Me First

Switching system
Table of Contents

Advertisement

Open-Me-First
2.1 General Installation Rules Continued:
Mounting Continued:
To install an system component in an equipment rack follow these steps:
1. Align the frame of the system component with the slotted opening in
the rack.
2. Install the bottom screws first.
3. Install the two top screws
4. Tighten all four screws securely.

Equipment Cabling

Considerable weight will be added to the rear panel of the Cougar and
Jaguar Routing Switchers by the control, signal, and power cables. There-
fore, all cables should be strained relieved and secured to racks or other
supporting structures. Failure to provide adequate cable support can result
in cables separating from connectors. If cable runs are to be stored under
an elevated floor, they should be tied to the racks as a guide. If cables are
run along the floor, do not allow them to lay in the work area behind the
racks. Stepping or tripping on the cables may result in connections being
pulled free or wire breakage inside the insulation. All routing switcher
system equipment items should be installed in the equipment racks prior
to attaching cables.
page 2.2
Installation

Figure 2-1 Equipment Chassis Installation

Section 2
07/96
P/N 81905903820

Advertisement

Table of Contents
loading

Table of Contents