Download Print this page

VENETA Vertical Honeycomb Blind Manual page 3

Advertisement

How to install your
Vertical Honeycomb Blind
#65101-10242-D
5
Movable Vertical Rail
Note: Slide the support shaft along the head rail to the
required spot.
Align the movable vertical rail to the sliding
support shaft in head rail.
Insert and screw the bolt until firm.
6
Fabric Clips and Rollers
Press onto headrail from the front of the blind.
NOTE: The rollers should be facing away from you.
7
Bottom Bracket
From the drawings below, decide which way you will face the bottom bracket
to be screwed to the wall or the floor.
Tilt the bottom of the fixed vertical rail out into the room and insert the bottom
bracket into the slot in the bottom of the fixed vertical rail.
We recommend drilling a pilot hole for the screw using a 2mm bit.
Fix the bracket into place using a medium screw.
Note: photo on right is taken from the rear of the blind.
8
Tension Cord
Remove the rubber band from the cord and bead.
Place the bead inside the bead housing from above, at the opposite
end of the head rail to the fixed vertical rail.
Note: focus on sliding the string down the slot.
Note: for Centre Opening and Day&Night model, repeat steps 3 to 7 for the other side of the blind.
3

Advertisement

loading